Interactive issue / Sequence builder / Illustrative
The Elevator Window
Freight elevator is booked 4:10–4:25, doors at 5:15. Shared power cannot be checked before the cases for amps, stands and cables reach the room.
Rebuild the critical path under these fictional room rules.
- Line-check, then mark outbound order
- Tag and stage cases before 4:10
- Move all room gear during the slot
- Confirm power and cable routes
Move the steps up or down, then check your order.
Takeaway: Find the critical path and identify what should already be packed when the load-out window opens.