Interactive issue / Side-by-side reader / Illustrative
A Calendar With One Free Friday
Wren has two rehearsals, one edit evening a week and a press request due May 7. There are no finished clips yet, and only the opening song is fully mastered.
Lay a format on this calendar and look for the bind.
Master the one finished song, use rehearsal 1 for a performance clip and rehearsal 2 for press photos.
Single plan: This gives the press request one usable asset and leaves a later session for the follow-up; there is only one song story at launch.
Reserve both rehearsals for pickup performances and specify which additional mixes must arrive before artwork lock.
Three-song EP: The extra songs supply more story beats, but an undelivered mix can block a unified announcement.
Takeaway: See how the release format changes lead time, assets, and the number of useful chances to tell the story.