Skip to contentOpen Music
Business.
← All interactives

Interactive issue / Scenario model / Illustrative

Deadline Meets Minimum Order

A fictional shirt preorder takes in $25 per confirmed order. The supplier quotes one fixed 60-shirt lot for $600; no smaller lot is offered. The band won't authorize it below 30 confirmed orders or without approving the late proof.

Slide orders through the 60-shirt cap. Compare cash coverage with or without the optional $125 reserve, without ignoring the band's own launch conditions.

Before reserve

$150.00

$25 received for each confirmed order minus the $600 fixed-lot check. Other costs omitted.

Base -$600.00 + $25.00 × 30

After reserve

$25.00

Same receipts and check, with $125 held separately for delays or refunds. The proof and 30-order go/no-go still apply.

Base -$725.00 + $25.00 × 30

Figures are modeled in USD from the fictional assumptions above. They are not a quote, forecast, or recommendation.

Takeaway: Watch commitments and supplier cash diverge, revealing when to pause or extend instead of ordering on enthusiasm.