Interactive issue / Scenario model / Illustrative
Deadline Meets Minimum Order
A fictional shirt preorder takes in $25 per confirmed order. The supplier quotes one fixed 60-shirt lot for $600; no smaller lot is offered. The band won't authorize it below 30 confirmed orders or without approving the late proof.
Slide orders through the 60-shirt cap. Compare cash coverage with or without the optional $125 reserve, without ignoring the band's own launch conditions.
Before reserve
$150.00$25 received for each confirmed order minus the $600 fixed-lot check. Other costs omitted.
Base -$600.00 + $25.00 × 30After reserve
$25.00Same receipts and check, with $125 held separately for delays or refunds. The proof and 30-order go/no-go still apply.
Base -$725.00 + $25.00 × 30Figures are modeled in USD from the fictional assumptions above. They are not a quote, forecast, or recommendation.
Takeaway: Watch commitments and supplier cash diverge, revealing when to pause or extend instead of ordering on enthusiasm.