Skip to contentOpen Music
Business.
← All interactives

Interactive issue / Sequence builder / Illustrative

The Load-In Run Sheet

A van arrives thirty minutes late at a fictional 100-seat room. Doors cannot shift; the room has only a single line-check window, and the backstage guest list is managed by someone else.

Arrange the dependencies for the remaining time, not your old ideal schedule.

  1. Verify the closing settlement
  2. Advance notice and revise loads
  3. Patch and line-check essentials
  4. Protect doors and performance

Move the steps up or down, then check your order.

Takeaway: Protect soundcheck, the performance, and settlement by seeing hard dependencies rather than memorizing a list.